TransCanada
		Energy East Pipeline Project
		
		Date: 2013 - Ongoing Description: 4600 km (42 in) pan-Canadian crude oil pipeline that will transport crude oil from Alberta to New Brunswick.
Services offered :
		
Valero
		Pipeline Saint-Laurent
Date: 2005 - 2012 Description: 242 km (16 in.) gasoline pipeline between Montreal-East and Lévis.
Services offered :
		
Gaz Métro
		Gazoduc Bécancour
Date: 2003 - 2005 Description: Longest river crossing by directional drilling (2.27 km) between Trois-Rivières and Bécancour for a 18 km (20 in.) gas pipeline. Johnston-Vermette won 2 Léonards (Vision and Énergie) from the AICQ for this project in 2007.
Services offered :
		
New Millennium Iron
		KéMag Slurry Pipeline Project
		
		Date: 2011 Description: 650 km slurry pipeline between Schefferville and Sept-Îles.
		 
Services offered :